EL-064612 · EL-064614 · Adamawa State, Nigeria
A district-scale, multi-commodity resource platform anchored by near-term gold production, with embedded copper and lithium upside — positioned to supply both precious metals and critical minerals into global markets.
"Gold gets us paid. Copper scales the business. Lithium brings the strategic premium."
Licenced Landholding (670 CU × 20 ha/CU per MCO)
Cadastral Units — One of the Largest in the Region
Gold · Copper · Lithium — Multi-Commodity Platform
Proven Gold Recovery Rate (Vat Leaching)
The Opportunity
The Adamawa licence area covers approximately 13,400 hectares across 670 cadastral units — calculated at the Nigerian Mining Cadastre Office (MCO) standard of 20 hectares per cadastral unit. This makes it one of the most significant consolidated land packages in Nigeria's emerging mining corridor, with confirmed multi-mineral discovery spanning gold, copper, and lithium zones.
670 Cadastral Units (~13,400 hectares per MCO standard) — federally licensed
Multi-mineral discovery across key zones: Gold, Copper, Lithium
Positioned in Nigeria's emerging mining corridor
Near-term gold production pathway: 6–12 months to first output

Gold-bearing quartz vein — Yebbi District, Adamawa
01
GOLD FIRST
Oxide deposits at 30–40m depth. Vat leaching deployed. Cash flow from Day 1 within 6–12 months.
02
COPPER SCALE
Veins identified across multiple zones. Industrial demand tailwind. Long-term revenue stability.
03
LITHIUM PREMIUM
Early indications across site sections. EV/battery supply chain exposure. Strategic valuation multiplier.
Three-Tier Value Engine
Three distinct commodity streams — each with independent value drivers — create a compounding investment thesis that strengthens at every phase of development.
Tier 1 — Immediate Monetization
Gold funds the operation from Day 1. No pre-revenue exposure. No dependency on external capital for growth.
Tier 2 — Scale & Industrial Play
Copper provides the industrial revenue base that scales the business beyond gold, diversifying cashflow and attracting infrastructure-focused capital.
Tier 3 — Strategic Optionality
Lithium transforms this from a mining project into a critical minerals platform — opening the door to strategic acquirers and premium valuations.
Why This Wins
Each pillar reinforces the others. Gold funds operations. Copper scales the business. Lithium premiums the valuation. The landholding ensures there is room to grow into all three.
Oxide deposits confirmed at 30–40m depth. Vat leaching technology deployed. First gold output achievable within 6–12 months of capital deployment.
Copper veins identified across multiple zones within the licence area. As global infrastructure demand accelerates, copper provides a durable, long-cycle revenue stream.
Early lithium indications across sections of the site position this asset within the critical minerals supply chain — attracting strategic acquirers and commanding premium exit multiples.
670 cadastral units (~13,400 hectares per MCO standard) of contiguous, federally licensed tenure creates a platform for district-scale resource development — not a single mine.
"This creates a layered value strategy, not a single-risk bet."
Licence Area
Two federally issued Mining Licences granted by the Nigeria Mining Cadastre Office cover a combined area of 670 cadastral units — equivalent to approximately 13,400 hectares (at the MCO standard of 20 ha per CU), spanning a >12 km strike length between Jada LGA and Ganye LGA in Adamawa State.
100% interest held by 6 Point Innovations LLP
Valid until 29th January 2028 (renewable)
Covers Gold, Copper, Lithium, Iron-Ore, Silver & associated critical minerals
Accessible year-round, 5 km from processing hub

22 PPM
Peak Grade
12+ PPM
High Anomaly
11.5 PPM
Confirmed Zone
10 PPM
Cluster Site
Interactive Licence Boundary Map
Click any polygon or grade marker for details. Map data © Google. Coordinates per Nigeria Mining Cadastre Office.
EL-064612
| # | Longitude | Latitude |
|---|---|---|
| 1 | 11° 59' 45" | 8° 33' 30" |
| 2 | 11° 59' 45" | 8° 39' 45" |
| 3 | 12° 0' 45" | 8° 39' 45" |
| 4 | 12° 0' 45" | 8° 33' 30" |
EL-064614
| # | Longitude | Latitude |
|---|---|---|
| 1 | 12° 0' 45" | 8° 33' 30" |
| 2 | 12° 0' 45" | 8° 39' 45" |
| 3 | 12° 1' 0" | 8° 39' 45" |
| 4 | 12° 1' 0" | 8° 37' 0" |
| 5 | 12° 2' 15" | 8° 37' 0" |
| 6 | 12° 2' 15" | 8° 33' 30" |
Business Model
Each phase is funded entirely from the cash flow of the previous phase. No repeated capital raises. No dilution. Growth is earned, validated, and compounded at every step.
Production Scale Trajectory
1,000 t/month
~$480K/month
2,000 t/month
~$960K/month
Medium Scale
Scales proportionally
10,000–20,000 t/month
Multi-millions/month
Competitive Advantages
670 cadastral units (~13,400 hectares per MCO standard of 20 ha/CU) of contiguous, federally licensed tenure — one of the largest consolidated resource positions in the region.
Gold, copper, and lithium confirmed or indicated across the licence area, creating three independent value drivers within a single investment.
Oxide deposits at 30–40m depth. Vat leaching technology proven at 80%+ recovery. First gold output achievable within 6–12 months.
Early entry into Nigeria's emerging mining corridor before institutional capital has repriced the region's resource potential.
Gold cashflow funds all subsequent exploration and expansion. Capital-efficient entry with exponential upside. No repeated dilution.
Production cashflow, asset revaluation post-drilling, or strategic buyout by a mining major or EV supply chain acquirer.
Investment Opportunity
Low initial CAPEX through a modular, phased setup. Fast payback driven by near-term gold production. Upside compounded by copper and lithium — a self-funded growth model that does not require repeated capital raises.
Investment structures are designed to align fully with investor objectives and are discussed exclusively with qualified investors following site engagement.
WHY THIS PROJECT STANDS OUT
Gold-Led, Fast Payback
Near-term gold production generates immediate cashflow. Modular setup minimises initial CAPEX. Fast payback without pre-revenue exposure.
Copper Upside — Scalable Industrial Revenue
Copper veins identified across multiple zones. As global infrastructure demand accelerates, copper provides a durable, long-cycle revenue stream alongside gold.
Lithium Potential — Strategic Premium
Early lithium indications across the site create exposure to the EV and battery supply chain — attracting strategic acquirers and premium exit multiples.
Multiple Exit Pathways
Production cashflow, asset revaluation post-drilling, or strategic buyout by a mining major or EV supply chain acquirer. Terms discussed privately with serious investors.
Phase A · 1,000 t/month
~$480K/month
Phase B · 2,000 t/month
~$960K/month
Phase C · Medium scale
Scales proportionally
Phase D · 10,000–20,000 t/month
Multi-millions/month
Investment Proposal
The Adamawa Multi-Resource Platform is open to strategic investment from qualified partners. We welcome initial discussions, due diligence reviews, and site visits before any formal terms are considered. Our priority is finding the right long-term partner — not the fastest transaction.
"We invite serious investors to visit the site, review our multi-commodity geological data, and engage directly with our team. Investment terms are structured to reflect the full strength of the asset — gold, copper, and lithium — and the seriousness of the partner."
Government-backed sector formalisation in Adamawa State creates a stable regulatory environment.
Three-commodity exposure: gold (cashflow), copper (scale), lithium (strategic premium).
670 cadastral units (~13,400 hectares per MCO standard) — one of the largest consolidated positions in the region.
No debt financing — 100% equity structure ensures full alignment between investor and founders.
Site visits arranged for qualified investors to verify the asset firsthand.
Regulatory & Community
We have proactively addressed every regulatory, land, and community requirement before production begins — ensuring a clear, uncontested path to operations.
EL → ML
Licence Conversion In Progress
Yebbi pilot zone
3
Districts Engaged
Yebbi · Bulo · Danaba
2026
Target ML Issuance
Nigeria Mining Cadastre Office
Royalty Settlement
The company is fully licensed and compliant with all regulatory requirements and is prepared to commence royalty payments immediately upon production start.
Land Security — Yebbi District
Land rights secured across the Yebbi District. All community stakeholders have been formally identified, engaged, and fully compensated prior to operations.
Mining Licence Conversion
The Exploration Licence (EL) in Yebbi is actively being converted to a Mining Licence (ML) to cover the pilot production phases under this investment proposal.
District Engagement
All Three District Heads Consulted.
Formal consultations completed with the district heads of Yebbi, Bulo, and Danaba — the three districts within the 670-cadastral-unit licence area. Community buy-in is secured.
State Alignment
Adamawa State Mining Officer Aligned.
A formal meeting has been held with the Adamawa State Mining Officer to align on all CSR obligations and community development activities to be carried out once production commences.
CSR Programme — Committed Deliverables
Borehole Construction
Community water access across the three districts.
Youth Employment
Local priority hiring for all mining activities.
School Inverter Systems
Solar inverter power for schools in the licence area.
Primary Healthcare
Medical supplies and support for health centres.
Worship Facility Support
Inverter systems for mosques and churches.
Exam Fee Sponsorship
WAEC & NECO fees covered for qualifying students.
Risk Mitigation
This project has been architected to succeed at every stage. Each identified risk is addressed by a specific operational or technical control built into the project design.
Geological Risk
Selective mining of confirmed high-grade zones; phased exploration validates resource continuously.
Metallurgical Risk
In-house laboratory and proven 80%+ recovery technology demonstrated over 3 years in Mauritania.
Operational Risk
Modular plant design enables incremental expansion without disruption to ongoing production.
Financial Risk
Production-funded model means the project pays for its own growth after initial capital deployment.
Investor Enquiries
We are seeking a serious strategic partner to co-develop one of Nigeria's most significant multi-resource opportunities — Gold, Copper, and Lithium across a district-scale licensed land package. Due diligence packages and site visits are available for qualified investors. Investment terms are discussed privately.
Request Due Diligence Package